whats hindering me??firstly its the materials.....its unstable
because of the relatively high temp in summer.it wrecks havoc
on quality of product.i drew up a graph used highly accurate
measuring digital equipment still materials seem to have mind of
its own which makes me stressed n work faster .that wasnt planned
and i hate surprises in that area.i had more better results in
winter.maybe i should play it safe n put it at minimum value in
order to have a stable work pace without surprises n stress..thinks
0.5 should be best value added.it might seem long but its the
safest bet and that time has not much consequences for end result
of product.thats safest n surefire way. or to cater for
optimum production,add certain amounts depending on temperature.if
i forgo this step many quality issues will occur which makes a hole
in my heart and speed up the process resulting in bad and
unpredictable results.so far i got good product with material
having mind of its own such as these but by having emergency fast
and dirty process to prevent disatrous quality issues isnt the way
to deal with materials that appear unstable due to temperature
variations and other factors.but adding little would be
catastrophic as that would destroy entire production as machinery
would be seized and i dont have anything to get rid of material s
safely without destroying everything in process.
---------------------------------------------------------------------------------------
secondly, i am always experimenting on ways to make it even
better with each product made.im not satisfied with past products
even they might be satisfactory to most people or the market.and
this has proved quite useful and improved design variety n
sometimes quality to remarkable standards.that is something
which i need although it takes some time.woke up today and will
modify previous production types and check for
workability.yesterday i had modified it and was pleased with its
performance and mass production rate.this is like the 10th mass
production type component with more than 30 tests done on all
of them.
19nov:this mornin at 7am built component and tested it.not to
my liking.to be postponed.problem was too much
handling adjustements in order to obtain intended results.to
have securing points redesigned.economic feasibility is still
valid.11am problem solved and looks great.tooling to be made for
better quality.
-------------------------------------------------------------------------------------------------
thirdly,i think i need more discipline here to use tools i made
that will speed up proces but seems like its slow when loading into
tools..like need 5 mins....nmessy n troublesome even though it
produces results.perhaps i should design a better tool.
results seen so far: 50% in quality control improvement
30%
in innovation improvement
20% in mass production improvement
protyping,sales,delivery,packaging,packaging design n
brochures not factored in.take note of protyping,sales n
delivery.