I think 860 will get extended only in 2017/2018.
Sembawang Interchange >> Sembawang Dr >> Sembawang
Way >> Canberra Link >> Canberra Walk >>
Canberra St
>> Canberra Way >> Yishun Ave 2 >> Yishun Central
>> Yishun Ave 9 >> Yishun Ring Road >> Yishun Ave
3 >> Sembawang Rd >> Springleaf MRT >>
Springleaf Rd >> Nee Soon Rd >> Sembawang Rd &
back...
* New extension will connect Canberra New Town to Sembawang,
Canberra, Yishun MRT
* New extension will connect Ring Road to Springleaf MRT
(TSL)
* New looping point will connect new development along
Springleaf road/Nee Soon road to Khatib MRT (NSL)
* 860A will continue to be required between Ring road &
Khatib MRT
I wonder if the extension is visible... Coz the loading already
picks up from Yishun Ring Road (Blk 419 Bus Stop) till my bus stop
(Blk 858). Load alight at Khatib MRT and then new load at Khatib
MRT...
The next load aft Khatib MRT would be from Yishun Ring Rd (Blk
624 Bus Stop)...
Extending to Springleaf doesnt make it useful but making the
waiting time for the bus longer. Just my opinion... Also sometimes
I take 860 to Temp YI, along Yishun Ring Rd, passengers tend to
take 860 more than 804...
Maybe Yes, there should be DDs on this service but maybe No
extension to Springleaf...
Maybe suggestion route would be somehow your route with a bit of
tweaking:
Sembawang Int - Sembawang Vista - Canberra Rd - Sembawang Rd -
Yishun Ave 5 - Yishun Ctrl - Yishun Ave 9 - Yishun Ring Rd - Yishun
Ave 3 - back route to Sembawang Int