In the article, the OCC personnel mentioned 5 difficulties they
faced, of which include:
1. Some MRT shuttles were caught in traffic jams and were unable to
arrive on time at the affected MRT stretch.
2. SMRT Buses has over 2000 service leaders and not all of them
are familiar with the MRT shuttle routes.
3. Limited personnel to guide MRT shuttle drivers.
4. SBS Transit declined to render help.
5. SMRT Buses only operates 25% of the bus routes in Singapore
and thus unable to deploy enough buses for MRT shuttle.
Reading through the above points, it makes me wonder that if
SMRT SLs are not familiar with the routes, what difference would it
make if SBST steps in other than being able to pump in some buses?
The situation would still be equally chaotic with SBST BCs awaiting
instructions from SMRT side.