Hmm yar lo,Even with the additional bendy for 180 and extra 2
buses for 184 still face e problem,Think you’re right run time
should be revised.Problem is SMRT Group supervisors
dont do survey on their bus services unlike SBST route
master.
not just run time.
dispatch gotta be systematic. Cannot say peak within peak I
chiong 6 mins for 960 or 2 mins for 180 until other peak belts dun
have e buses.
No bus, erratic headways.. Later your off peak period also
screwed.