Winson.W SG They are going to fully utilise the whole land beside the current interchange right? It's bigger than the current one actually. Now some sixth sense tells me that it will resemble Boon Lay Temp Int...No, it smaller. Same width, but shorter in length.
SBS 1000U SG 17, 18, 60, 69 mayb call outside Bedok Temp Int bus stop perhaps Should extend 18 to Eunos.
AEW5001 SG Especially 969. It's the people being choosy there, I've seen it myself, or perhaps they don't need bendies at all? sv969 only need bendies during split shift.
Winson.W SG More update: More of the bus stop berth piler are done and the road for the bus park and boarding breth are also in the mid of the construction. And I think they are doing the land measuring for a shelter walkway linking to the MRT stn.
iveco SG 17, 18, 60, 69 mayb call outside Bedok Temp Int bus stop perhaps Maybe some BDK routes may be amended, who knows.9 & 35 can start from EUN. That side very dead.
SBS 1000U SG 18 can take over 7 easily. Don't think so. Extend 7 to Tampines will cause more stress to the service.I was thinking of extending 18 to Eunos via Marine Parade to Kembagan to Eunos, since there is no direct link from Kembagan to Marine Parade right now.
Winson.W SG Update!The roof structure is done for installing and has started painting. The construction of a toliet/ office has started.
Winson.W SG Update:The construction of basic structure on boarding area A is done. Now, construction for boarding area B has started. After the construction, you will see a 'L' shape int.
TIB1010Y SG I m curious.. any pic?? thx... i still wondering when yishun int will be upgraded.. the shops ard the int had recently been close to giveway for new developement..
iveco SG I m curious.. any pic?? thx... i still wondering when yishun int will be upgraded.. the shops ard the int had recently been close to giveway for new developement..I hope YSN will be DD-friendly when it is rebuilt. Hopefully K Shanmugan decides to expedite it to win more support in 2015.
Winson.W SG How to upload photo?Anyway, just a update. Now they are doing a 'U' shape int, with a entrance orexit located at the right corner of the 'U'. For the right side of the 'U', the piler and the roof structure is done. For the base of the 'U', the construction of the piler and the roof structure is half-way-through for bothe entrance or exit and the berth. For the left side of the 'U', the piler work has just started......
Winson.W SG I m curious.. any pic?? thx... i still wondering when yishun int will be upgraded.. the shops ard the int had recently been close to giveway for new developement..I will take some tomorrow and will upload it in my blog or Facebook, confirm with you tomorrow.
carbikebus SG Is it possible to built a multi-storey bus Interchange rather than air con ones?AC Int is overkill.