Ha ha ! There are many confusion of the CCL and NEL, isn't it
?
What I know is that:
--CCL will be operated by SMRT
--CCL will be using the same train as the NEL one, and it is
driverless
--CCL will be using 6 carriage train
Quoted form the ALSTOM website:
------------------------------------------------------------------
CBTC Singapore, CCL
Continuing Metro Automatisation
Contract: Singapore, Circle Line
Customer: Land Transport Authority (LTA)
Main features: Automatic Train Supervision, CBTC Automatic Train
Control, Conventional Products, Communication system and
Computer-based Interlocking
Delivery date: from 2006 to 2008
The total route length will be 32 km in tunnel comprising 29
stations with one depot. The complete automation of train
operations is made possible by its signaling system, which
constantly monitors and safely controls the movements and locations
of the trains. ALSTOM provided URBALIS 300 CBTC, a fully proven
Driverless Signaling system that comprises: the Automatic Trains
Supervision system ICONIS, the Automatic Train Control MASTRIA,
some conventional products SMARTWAY and the Interlocking
SMARTLOCK.
Moreover ALSTOM supply on-board Passenger Information system and
ensures the transmission of on-board CCTV through its bi
directional Train to Track transmission system (IAGO).
------------------------------------------------------------------------------------
Some pictures form the ALSTOM website on the CCL train


Singapore Metropolis (circle line) on Valenciennes test
track