sbskidz SG There seems to be a new Serangoon Interchange ( maybe aircon), to replaced the old interchange. The interchange should built together with the new circle line. I am not sure if this news is accurate a not as i found it in the net, but the website is ITA. Links: http://www.lta.gov.sg/land_sales/doc/Requirements%20of%20the%20LTA%20-%20Appendix%20G%20-%20Part%20A%20(Design%20Requirements%20for%20SER%20Bus%20Interchange).pdf http://www.lta.gov.sg/land_sales/doc/Requirements%20of%20the%20LTA%20-%20Appendix%20D%20(Bus%20Interchange%20Requirements).pdf
sbskidz SG Another link found on Yahoo: http://sg.search.yahoo.com/search?p=Serangoon+Bus+Interchange&ei=UTF-8&fl=0&vc=countrySG&fr=FP-tab-web-t&vst=0&vs=www.lta.gov.sg
105090 SG yess. it was said Buona Vista., Clementi and Serangoon will get Aircon Interchange. Serangoon was said to get a shopping centre like ngee ann city…
iveco SG Buona Vista? Will Ghim Moh and Buona Vista terminals be closed? How will BNV & GHM routes be amended?
iveco SG I predict that 111 will operate from MRC terminal and loop at Ghim Moh road. Anyway, the proposed BNV Int was meant to be co-located with the new LTA HQ. THe plan was shelved after a public outcry over misuse of funds. Don't tell me the BNV Int will be built along with the CCL?
5454 SG ya, that could happen and maybe service 100 will be turned into a loop service from serangoon int.
iveco SG Is it likely? It will be even longer than svc 16. Carbikebus won't like it. Some other predictions: 32 & 145 to ply Holland Dr both directions, calling at bus stops outside and opposite BNV swimming complex. 74, 91, 95 & 191 to be shortened, skipping C'wealth Ave and Holland Dr altogether. 92 will be a little messy. I wonder how SBST will sort this out. 200 will remain unchanged.
Airbus330Captain SG Svc 100 ’s journey is too long to be a loop service , my guess is she may terminate at Jurong east.
iveco SG If Svc 100 terminates at JUE, it would be duplicating 105. Unless, of course, it takes a different route. What are possible routes could it take?
iveco SG Unlikely to happen since BBT is "enemy" territory these days. It would also be out of line with the CTS scheme.
105090 SG the merger of Buona Vista and Ghim Moh terminals was to have a new site opp BNV MRT the site there, aircon. it was also said this was to convenient the people who goes there daily like Science Park, NUH, NUS, etc.
ZYX2005 SG the last i heard:- the bouna vista int plan was shelved. clemeti AC int to proced construction soon. 40 storey office bldg to build on site also macham HDB hub development in TPY last time. i was hoping for a new cinema but the town council newsletter din say nothing abt that. serangoon int AC int plan i not hear b4 ZYX
sBs_boy SG Ever since CCL construction started, there were plans that a new Int was to be built together wif a Shopping Center plus some housing...
carbikebus SG [quote]Originally posted by iveco: [b] Is it likely? It will be even longer than svc 16. Carbikebus won't like it. I don't mind as i'm a Standby BC BTW. Services that i know S11,64,82,83,100,101,103,105,112,113,158,161,315 & 317
tranquilice SG This is old news already. When LTA annouced the sale of site at Serangoon Central in January 2003, there was plan for a new bus interchange. http://app.lta.gov.sg/corp_press_content.asp?start=663
iamgoondu SG Though the LTA HQ was shelved, BV int remains part of the project of vista exchange, one-north. http://www.one-north.com/pages/vistaXchange/index.asp# The map identifies the new site.