LTA to build $436 million Boon Lay
MRT extension
SINGAPORE - The Land Transport Authority (LTA) will be extending
the East West Line from Boon Lay Station westwards into the Jurong
Industrial Estate.
The extended network will enhance public transport system for
residents in Jurong West Town area and those working in the Jurong
and Tuas industrial estates.
Known as Boon Lay MRT Extension (BLE) which will be
fully-elevated with two MRT stations will add another 3.8-km to the
existing East West Line.
The BLE One station will be built at Jurong West Street 63, between
Jurong Street 61 and Pioneer Road North, and the other station at
Joo Koon Circle, near the junction of Benoi Road and International
Road.
The overall project cost will be about S$436 million and
construction is targeted to start in the second half of 2005 and is
expected to complete in 2009.
To facilitate the construction of BLE, one full lot and eight part
lots, totalling about 28,000 square metres of land will be
acquired.
Extracted from Asia One, Business Times ©
Singapore Press Holdings 2004
Sources:
http://business-times.asia1.com.sg/sub/latest/story/0,4574,140445,00.html
http://www.channelnewsasia.com/stories/singaporelocalnews/view/124716/1/.html