Bus and Train LoVuR SG Installation of half-height PSDs in above-ground MRT stationsTotal of 54 sets for stns with 2 platforms, and 108 sets for stns with 4 platforms1. PSR - 54 (Complete, PSDs under test) 2. YIS - 53 (27 + 26) 3. JUR - 88 (24 + 24 + 22 + 18)
SBS7322B SG PSR's PSD is doing some test , whether it can open and close or not.Took a video of that.http://www.youtube.com/watch?v=D_zDXO6rRDs
Bus and Train LoVuR SG a typical day at Jurong East with this C651Most of them will underrun , overrun is not so common.
Bus and Train LoVuR SG UPDATE : 16 PSD sets at platform C. In one day , 6 PSD sets were installed , that's fast!
Khairiano SG Update: - Platform C got 22 sets - Platfrom B & D got half PSD 62 + 22 + 0.5 + 0.5 = 85 PSDs
jcqh SG Count this as 1 each.As of today, Platform C still has 22 sets.So total: 24 + 24 + 22 + 0 = 70
Bus and Train LoVuR SG Today eastbound platform got 6 PSDsAlso saw it just now , don't have top cover.
ignoramuses SG Yishun Station Southbound Platform (Southern End) has the manual glass doors (the access door to the tracks) at the end installed.
willis_chong SG Yishun Station Southbound Platform (Southern End) has the manual glass doors (the access door to the tracks) at the end installed.3 of 4 sides have been installed. Can someone update the list? Thanks.
Nathpoop SG Pasir Ris has one of it's platform being cordoned off and did PSD testing just now, around 10++pm. Open and close. open and close.
QX179R SG Pasir Ris has one of it's platform being cordoned off and did PSD testing just now, around 10++pm. Open and close. open and close.yup, I spotted that as well too.. to be exact, platform A was cordoned off.. time of spotting was at 2254hrs..