The 3 DTL stations on the map use working names too, so
what make the schematic diagram less confirmed?
When the 5 DTL stations were announced, it was announced as the
Downtown extension (DTE). At that time, they did not plan that BTL
and part of ERL will be stage 2 and 3 of this line. They treated
this DTE as individual line. But later it was decided to
extend this DTE with another 2 stages. These 5
stations, previously on a line by itself, are now on the
middle stretch of the DTL line.
http://www.lta.gov.sg/images/location_plan.jpg
yes, i know how the 'continuous' line looks like, and they now
happen to be the middle stretch, but so what? it is still DTL stage
1 what.
by saying 'less confirmed', because only those enthu and/or
obsessed about trains would go and access these kind of thing, but
the map is obviously easily accessible at the official LTA website.
and if the DTL1 stations are totally not confirmed, why did they
even bother to number them on the map? since they already put it
there, what makes u think when the stations open in 2013 they
cannot use the numbers given there?
theres no room for pointless debate on this kind of thing. one
thing for sure is, the alphanumeric codes are not yet confirm, so
dont label the stations with the numbers, unlike the CCL which are
already confirmed.