willis_chong SG is the platfrom ready yet?The PSDs are ready. But the platform isn't. Maybe still installing the air-con?
Stage SG It's quite cool since the PSD's open all the time and a lot of SMRT staff are walking around the platform.
jayh272416 SG It's quite cool since the PSD's open all the time and a lot of SMRT staff are walking around the platform. have to. if not ppl will assume that got PSD den walk close close dey
TownLink 291 SG have to. if not ppl will assume that got PSD den walk close close dey fall onto teh tracks then we have a " Not Again! " thread here.
201911 SG not from the northbound platform, but the rest of the station, which is also being upgraded:new station exit, roof cladding works are almost done, scaffolding should be removed soonhttp://www.flickr.com/photos/[email protected]/
jcqh SG Yesterday i took 229/230, and when the train reached Bishan northbound, guess where it stopped!
Khairiano SG Yesterday i took 229/230, and when the train reached Bishan northbound, guess where it stopped! lol! this one can only 1 people at a time for enter and exit ..i think for me i cant get out.. if can i kena squeeeeezzzeee like hell.. =D
nenepokey SG Yesterday i took 229/230, and when the train reached Bishan northbound, guess where it stopped!not bad...overun by more than 0.5m. good job..
jcqh SG The train operator did not stopped properly ? yup, the passengers had to "queue" up to get out one by one, and the others come in one by one, so the train stopped there longer than usual (abt 40s)
willis_chong SG not bad...overun by more than 0.5m. good job..Omg... If I drive MRT sure die one... I drive MTR on BVE die already leh...
jcqh SG Omg... If I drive MRT sure die one... I drive MTR on BVE die already leh...where to download this?
willis_chong SG where to download this?I using openBVE.http://openbve.uuuq.comBVE 2 and 4:http://mackoy.cool.ne.jpRoutes (MTR):http://bvehk.net/