won't be so soon, north shore line is meant to link towns in the
north eg. Woodlands, Yishun, Punggol/ Sengkang, Pair Ris etc. right
now there's little development between these towns and bus links
between them (39, 85, 161, 168, 965, 969) are available. so wait
long long for north shore line to be built. won't be before 2012
anyway.