^tamago^ SG thanks for the updates. there was a speculation that both will open together after air-conditioning systems are ready, but now we know for sure that SB will open by 2Q 2008 and NB by 4Q 2009.
^tamago^ SG Bishan total costs for this refurbishment plus CCL itself is $82mil, other stations average out at $60mil.
Frogleg888 SG How about Jurong East train Interchange? Is there any upgrading news? Being an interchange station,i feel sorry to see it has only two escalators (one up,one down)serving passengers to ticketing floor.
uglyguy SG wah piang eh! u all now say good... later they all increase price then u all complain... common lah... wait for the train most 7mins... then in the end must pay $0.20 per trip. i rather save $$$...
^tamago^ SG i dun think so. btw it has 8 escalators/stairs plus 2 lifts between ticketing concourse and platform.
Novawin SG That's cool! Looking forward to see NSL Bishan station being refurbished to be fully air-conditioned station by 2009 before CCL Stage 3 is due in 2010.
SMRT 32373238 SG hmmm so i guess the boardings right in front of the faregates and control station is a new set of faregates for the new SB platform?