*Lord Kang* SG I thought circle line will take another few years to complete..Then these new train come so early for wat??White elephants ah??
SMRT 32373238 SG the stage 1 project delayed mah... cos of NCH stretch... it was actually due to be ready by 2006-2007...
^tamago^ SG kim chuan underground mah, then tucked away somewhere in the KPE and ORR mess... i dunno how many of the trains are here yet though... and yes, they are 3-car trainsets...
^tamago^ SG train no use horsepower de lah. typically 0-60 in 22 seconds. trains use traction motors de, not the choo choo train wor~ heat from the engine is drown away by large exhaust fans installed in the tunnels. aboveground, heat is exhausted naturally.
^tamago^ SG hoping stage 2 (and eventually stags 3, 4 and 5) can open first. technically possible anyways.
^tamago^ SG 2008 bah. they're doing quite fast actually, but paya lebar side is a mess as they're supposed to finish together de.
SBS9828X SG hes just being sarcastic... umust reply like dis next time 1001hp... engine borrow from veryon hamman quad exhaust with chrome finish... at the rear got spoiler also
^tamago^ SG actually nothing. no seats done up yet. tat's why photographer didn't take, say it's not meaningful...
sbst275 SG 1 of them on the news today LTA expects 50,000 passengers on the 44km CCL when it fully opens