Hello guys.
This is a continuation to "Do You
Know" posted by me on Jan 12 2007.
#1. Introduction of
the Wheelchair Accessible Buses (WAB) by SBS Transit.

copyrighted(c) tamago.
SBS Transit Ltd was the first bus company in singapore to
introduce the first wheelchair-accessible bus service in Singapore.
From 27 June 2006, 10 buses in the existing Service 21 fleet will
come with wheelchair-friendly features such as a manually operated
ramp for boarding and alighting, and a single wheelchair parking
space.
LTA has required all new public buses registered in Singapore from
2006 to be wheelchair-accessible. These buses will be introduced
progressively to replace the existing fleet of
non-wheelchair-accessible buses. The decision to introduce
wheelchair-accessible buses was made following a review by the
Ministry of Transport and LTA, and is in line with the
recommendation from the Committee on Ageing Issues. MOT has
approved the funds for the incremental cost for the
wheelchair-accessible buses at $6,000 per bus for 3,550 buses over
the next 17 years.
#2
Introduction of new set
of Quality of Service (QoS) standards for basic bus services by the
Public Transport Council (PTC). [The PTC earlier established a
comprehensive set of bus service standards and specifications to
regulate the performance of the basic bus operators in
1994.
#3. Commencement of
upgrading of road facilities within a 400-metre radius of MRT and
LRT stations to enhance barrier-free accessibility by
LTA
#1. Opening of the
Fort Canning Tunnel

The FCT project was based on the
Urban Redevelopment Authority's plans for the Museum Planning Area.
Over 3,000 vehicles pass through Stamford Road every hour during
peak periods. With the old traffic scheme, motorists stopped at 2
traffic lights at slow speeds, which made the area prone to
congestion. In view of increased traffic from new developments in
Marina Centre and Marina South to the Orchard shopping area, design
plans for the tunnel were drawn up to allow motorists to bypass
several traffic junctions. The tunnel cuts journey times from 5
minutes to as fast as 18 seconds.
The construction of the FCT would
form a grid pattern, resulting in more efficient land use for the
adjacent Singapore Management University (SMU) campus. The
realignment of Stamford Road would make also the journey to Bras
Basah and Little India smoother. By cutting through Fort Canning
Hill, the historical and environmental significance of the area
would still be preserved. (from
wikipedia)
#2
Extension of the full-day
bus lane scheme to five locations in the CBD, namely Eu Tong Sen
Street, Hill Street, Victoria Street, Bras Basah Road and Somerset
Road.
![[Full+Day+Bus+Lane+Plate.jpg]](http://bp3.blogger.com/_3q85clW40Q8/RhYQ2uVRlRI/AAAAAAAAACs/V_HBS41E2Pk/s1600/Full%2BDay%2BBus%2BLane%2BPlate.jpg)
http://sgtransport.blogspot.com/
#3
Approval by the Singapore
Government for the building of the 40km Downtown Line, which is
scheduled to complete by 2018

The Downtown Line
(DTL) will be the fifth Mass Rapid Transit line in
Singapore and is currently under construction and
planning/evaluation. The line will be about 40 km long with 33
stations. It will be a fully automatic and driverless system
similar to the North East Line and the Circle Line, and will be
mostly underground. The line will serve the Bukit Timah region and
the Eastern region and bring commuters to the New Downtown area.
The line is tentatively coloured brown in the rail
map.
#4. Approval by the
Singapore Government for the construction of the 5km Marina Coastal
Expressway (MCE), where there will be a 3.5km long underground
tunnel and a 1.5km long above-ground road structure.
The 5 kilometres
(3.11 miles) MCE will connect the southern end of the
Kallang-Paya Lebar Expressway (KPE) and its junction with the East
Coast Parkway to the eastern end of Ayer Rajah Expressway. This
links the eastern and western parts of Singapore to the New
Downtown, currently being developed in the Marina Bay area. The
MCE, with five lanes in each direction, would handle the large
number of commuters to be drawn to the offices, homes and
recreational attractions there. It will also open access to the
proposed Marina Cruise Centre in Marina South and the existing
Marina South Ferry Terminal
#5. Introduction of a
6-month trial for both the Real-Time Bus Arrival
Information panels and the Key Bus Services Map
(around Orchard Road area)
![[RTI_DelfiOrchard2+(Small).jpg]](http://bp2.blogger.com/_3q85clW40Q8/Rq_ZybfgPyI/AAAAAAAAAOI/ia5blViHwDM/s1600/RTI_DelfiOrchard2%2B(Small).jpg)
Copyrighted: http://sgtransport.blogspot.com/
Commuters will have the convenience of knowing how long more
their buses will take to arrive at these bus stops, as these will
be progressively fitted with LED panels by end August 2007. The
panels will display the bus services that call at a particular bus
stop, the arrival times of the next and subsequent buses for each
bus service, and a symbol to indicate whether the bus is
wheelchair-accessible.
#6. Further tightening
of the Quality of Service (Qos) standards for basic bus services by
the Public Transport Council
#7. Implementation of a
3-month trial on Electronic Bus Journey Planner by the LTA and
Transit Link
#8. Opening of Phase 1 of
the Kallang-Paya Lebar Expressway (KPE) - the section from ECP to
PIE

Connecting the East Coast Parkway
and the Tampines Expressway in the north-east, the 6 lane
expressway will extend twelve kilometres, with approximately
8.5 kilometres (5.28 miles) of main cut and cover
underground tunnels running some 10 metres underground when fully
completed. Built at a cost of approximately S$1.8 billion (US$1
billion), it will be the longest subterranean road tunnel in
Southeast Asia. The KPE is also believed to be the world's sixth
longest underground road project under construction. In all, the
dual-carriageway expressway with three lanes in each direction will
have eight interchanges, eleven on-ramps, and twelve
off-ramps.
#9. Extension of morning
ERP hours on the southbound CTE ERP gantry and installation of new
gantries at the southbound BKE (between Diary Farm Road),
northbound CTE (before exit to PIE) and the eastbound ECP (before
Rochor Road exit and from Ophir Road slip road)
#10. Appointment of an
International Advisory Panel (IAP) by the LTA, to advise them on
their transport policies and strategies, and to help keep the LTA
abreast of the latest global trends and developments in land
transport. The IAP held its inaugural Meeting in
Singapore
#11. Taxi Fare
Hike

(www.asiaone.com)
The taxi fare hike follows what it says was an 'in-depth review'
of the taxi industry to address commuters' concerns, simplify the
fare structure and encourage call bookings 'to better match the
demand and supply of taxis'
Under the new pricing structure, ComfortDelgro says, the bulk of
its passengers who travel during off-peak hours will pay 10 per
cent more in fares.
All other passengers will be expected to pay between 18 per cent
and 49 per cent more.
The biggest jump in fares will affect those who take cabs from
the city from Mondays to Thursdays, between 8pm and midnight.
Instead of $7.65 currently, they'll have to fork out $11.40.
#12. Increase in
the number of taxi stands

The Land Transport Authority (LTA) today announced the location
of 15 new taxi stands to be installed within the Central Business
District (CBD), bringing the total number of taxi stands in the
downtown area to 95.
The taxi stands will be installed by the end of December this
year, and will bring a taxi stand to within 300 metres or a
five-minute walk from buildings within the CBD.
A statement from LTA said that it would be coordinating with
taxi companies and taxi driver associations to encourage cabbies to
pick up passengers from taxi stands.
LOCATIONS OF THE 15 NEW TAXI STANDS
- Amoy Street
- Armenian Street
- Clemenceau Avenue
- Robinson Road
- Kreta Ayer Road
- Neil Road
- Old Parliament Lane
- Peck Seah Street
- Penang Road
- Purvis Street
- Sago Lane
- Short Street
- Stamford Road
- Tan Tye Place
- Waterloo Street
#1. Public Transport
Review

The land tansport review was announced by transport minister, Mr
Raymond Lim on January.
Several measures and objectives were put in place. financing
Refer to post on Public Transport Review for more
information.
-END-
sbskidz 