*Topic Unlocked*
Hmm... The C100A was never failed, it's just that I'm still
tweaking some stuff. Due to tunnels being too large, I need to
adjust the width of the train, to allow the tunnel to be
resized.
And the C100A has new specifications, so yeah. :)
*Topic Locked*