Below are the list of freight trains that occasionally enter
Singapore.
Format:
Train Number (From - To) - (Commodities) - Trips per
month
Train 156Up (Singapore - Port Klang) - Container Train - 4 trips
per month.
Train 157Dn (Port Klang - Singapore) - Container Train - 4 trips
per month.
Train 191Dn (Pasir Gudang - Singapore) - Container Train - 12
trips per month.
Train 192Up (Singapore - Pasir Gudang) - Container Train - 12 trips
per month.
Train 205Dn (Prai - Singapore) - Sugarliner (Containerised)
- 4 trips per month.
Train 206Up (Singapore - Prai) - Sugarliner (Containerised) - 4
trips per month.
Train 327Dn (Padang Rengas - Singapore - Cementliner - 12 trips
per month.
Train 328Up (Singapore - Padang Rengas) - Cementliner - 12 trips
per month.
Train 347Dn (Tasek - Singapore) - Cement (Containerised) - 4
trips per month.
Train 348Up (Singapore - Tasek) - Cement (Containerised) - 4 trips
per month.
Train 509Dn (Ipoh Yard - Singapore) - Quicklime - 4 trips per
month.
Train 510Up (Singapore - Ipoh Yard) - Quicklime - 4 trips per
month.
Train 511Dn (Serendah - Singapore) - Bricks - 4 trips per
month.
Train 512Up (Singapore - Serendah) - Bricks - 4 trips per
month.
Train 575Dn (Mengkibol - Singapore) - Sand - 4 trips per
month.
Train 576Up (Singapore - Mengkibol) - Sand - 4 trips per month.
Train 579Dn (Genuang - Singapore) - Bricks - 9 trips per
month.
Train 580Up (Singapore - Genuang) - Bricks - 9 trips per month.
*However, freight trains although have a timetable, but they do
not have any specific time to reach their destination. This is
because, Passenger trains have more priority than Freight trains.
Almost all freight trains have to wait for the line ahead to be
cleared before they can proceed. As they do not require to stop at
any station, it is much preferred to have the line ahead clear so
that the goods can be delivered safely.