The MRT (Mass Rapid Transit), sometimes referred to as the
Bangkok Metro, is Bangkok's underground metro system. It was
constructed under a concession concept. Most civil infrastructure
were provided by the government sector, Mass Rapid Transit
Authority of Thailand (MRTA) and handed over to their
concessionaire under a 25-year concession agreement. Bangkok Metro
Company Limited (BMCL) is the only private sector company that won
a bid in MRTA's concession contract for the blue line. As MRTA's
concessionaire, BMCL provides M&E equipment, including
electrical trains, signalling systems, SCADA, communication, PSD,
etc for the subway project and fully operates the system. To
maintain the system, BMCL has subcontracted in 10 years to Siemens
which was the M&E system supplier since system opeing and 7
years maintenance contract to two local maintenance services for
north and south line. The MRT line is officially known in Thai as
rotfaifah mahanakhon (รถไฟฟ้ามหานคร) or "metropolitan electric
train", but it is more commonly called rotfai taidin (รถไฟใต้ดิน),
literally, "underground train". The metro has a fleet of 19 trains;
the 19th train entered service in October, 2007 after a major
accident.
The construction of the first Bangkok Metro line, officially known
as Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) – "Celebration of
Royal Auspice" – or informally as the "Blue Line", began on 19
November 1996. The project suffered multiple delays not only
because of the 1997 economic crisis, but also due to challenging
civil engineering works of constructing massive underground
structures deep in the water-logged soil upon which the city is
built.
The Blue Line was opened for a limited public trial period of
several weeks starting on 13 April 2004. On 3 July 2004 the line
was officially opened at 19:19 local time by HM King Bhumibol and
Queen Sirikit, who were accompanied by other members of the royal
family. Within 30 minutes of its opening, sightseers filled the
system to its maximum capacity, but after the initial rush
ridership has settled down to around 180,000 riders daily —
considerably lower than projections of over 400,000, despite fares
being slashed in half from 12-38 baht to 10-15 baht per trip. From
2006 until 2008, fares ranged between 14-36 baht per trip. The fare
was raised to 16-41 Baht on 1 January 2009.
The 21-kilometer, 18-station Blue line presently runs from Bang Sue
to Hua Lamphong via Phra Ram 9 and has a carrying capacity of
40,000 people in each direction per hour. Similar to the Skytrain,
the Metro uses trains supplied by Siemens which travel up to 80
km/h. Passengers can conveniently connect to the Skytrain at Si
Lom, Sukhumvit and Chatuchak Park stations. The metro has a
large depot in Huai Khwang district, which is located between Phra
Ram 9 and Thailand Cultural Centre stations. Considering that
Bangkok is a low-lying plain which is prone to flooding, all of the
Metro's station entrances are raised about one metre above the
ground level and are equipped with built-in floodgates in order to
avoid water inundating the system. Lifts and ramps are found at all
stations, providing easy access for passengers in wheelchairs.
Stations have multiple passage ways (generally four) which allow
passengers to connect to any corner of the adjacent surface
intersection. Maps depicting the local area and exit points are
posted on the walls on the way out. Due to safety considerations,
platform screen doors are installed. Uniformed security personnel
and security cameras are present at each and every platform.

19 three-car metro trains, of the Siemens Modular Metro type, are
used. Each metro train consists of two motor cars and a centre
trailer car.

The ticketing system uses RFID contactless technology with round
black tokens issued for single trips and contactless stored value
cards for frequent travellers. In the near future, a joint
ticketing system will be set up so that passengers can use a single
ticket on the Metro as well as on the Skytrain. Multi-storey park
& ride facilities are provided at Lat Phrao and Thailand
Cultural Centre. Motorists who park their cars at these premises
will be issued with additional contactless smartcards and they need
to have them electronically stamped at their destination
station.
On 17 January 2005, just after 09:15, an empty train returning to
the depot collided with a peak-hour train filled with passengers at
the Thailand Cultural Centre station. 140 people were hurt, most of
whom sustained only minor injuries, and the entire Metro network
was shut down for two weeks.
After initial investigations, it was found that the empty train had
run into problems shortly before the accident, grinding to a halt
on a curve leading to the depot. The driver applied its brake and
was waiting to be towed to the maintenance centre close to Thailand
Cultural Centre station.
A rescue train was attempting to connect to the stalled train when
the driver was told to release the brake while coupling had not yet
been successful. It was then that the empty train began to roll
backwards at a speed of ten metres per second, before smashing into
the other train, which was carrying passengers. Therefore, it was
believed that the incident was caused by negligence due to
insufficient training of operation staff. This accident also
resulted in two damaged trains with heavily damaged areas limited
to the two leading cars. The colliding speed was suspected to be
about 60 km/hrs due to the appearance of damaged areas. However,
one train, which was rebuilt from the repair of the minor-damaged
cars, was already fitted for operation at the end of 2006 and the
remaining one was still under heavy repair until mid of 2007; it
was released into service in October, 2007. The cost resulting from
the accident might be a much higher figure than BMCL quoted, and it
was expected to be at least 400 million baht, which was totally
insured by a local insurance company. The accident was recorded as
the most severe damage ever in any metro system in Thailand.
The Metro resumed full operation on 1 February 2005, and passenger
numbers soon rose back to pre-crash levels, partly due to a
temporary promotional fare scheme which allowed passengers to
travel any distance on the MRT for only ten baht (SGD 0.42).
Various expansion plans of the Metro have been proposed, as of
2010, construction work has been started on the MRT Purple Line. It
is planned that, eventually, the combined route distance of the
Metro alone will total 91 km with 3 Metro lines covering all of the
major areas of Bangkok. The Blue line, once completely extended,
will form a lariat-shaped loop encircling the city.