Wah!!More than A$100,000,000 or 100
million for each platform spent and still cant
operated in bad weather!!
Nine of the original order of 11
twin-engine SG-2G(A) Super Seasprites have been delivered to the
navy's 805 Squadron based at Nowra, NSW, but have been grounded
because of technical and air certification issues.
Oz axe Vietnam-era airframe orphan
platform Seaspriteat last.
Money is small matter----,each @ A$66 million in 1997!
but the pressing question is:
How can oz to protect'' navy's Anzac class
frigates
http://www.naval-technology.com/projects/anzac/
without a vital capability designed to protect them
from hostile ships and
submarimes''?

http://www.naval-technology.com/projects/anzac/
no more landing!!
I dunt know whether some platforms are not suitable for
refurbishment /upgrading,or
some countries cant do this kind of jobs!!
(Oz M113 APC upgrading takes 10 years and still work in
progress)
Do i look like anti--oz again?
I dunt know if oz short of good lawyers or good military
officers to protect the country in a est A $1.3
billion defense contract.
When the products cant work properly,the Oz
gavaman still cant sue the manufacturer!
Now I agree with LKY that he prefer 1st class honor law grad
work for gavaman.
Pl dunt take this incident as pure politics.
The project should not have been started---wrong platform!!
oz new gavaman is right to scarp this long delaying projects and
quickly get a replacement to protect the Anzac-- class Frigates!!
THE Rudd Government's decision yesterday to finally axe
the $1billion Seasprite helicopter program has left the navy's
Anzac class frigates without a vital capability designed to protect
them from hostile ships and
submarimes.
ps and submarines.Patrick Walters, National security editor |
March 06, 2008
http://www.theaustralian.news.com.au/story/0,25197,23327008-31477,00.html
----
...The sorry saga will be studied by generations of defence
procurement experts as a classic case of how not to go about a
major equipment purchase.
The Seasprite project dates back to the early 1990s, when the
navy wanted a helicopter for its planned "Offshore Patrol
Combatant", a smaller warship it planned to build in partnership
with Malaysia.
When the Malaysians pulled
out, Defence should have axed the project, but the Seasprites were
then earmarked for the Anzac-class frigates, with a contract
finally signed in 1997.
Australia's Defence Department stands indicted for approving an
"orphan platform" uniquely
designed for our navy with the extraordinarily ambitious aim of
incorporating state-of-the-art
avionics into a 1960s airframe. ..
http://www.theaustralian.news.com.au/story/0,25197,23327014-31477,00.html
pl read other articles in this link.
2.pl read my old postings
http://www.sgforums.com/posts/search?q=Seasprite
http://www.sgforums.com/forums/1164/topics/236721
Posted on 10.Feb .2007
Oh My God!Why Aussie spent good A$667m to buy 11 Vietnam
era
heli air frame ,each A$66 million in 1997.To be fair
, seven of Australia's Seasprites were built between
1963 and 1965.
The remaining four were constructed between 1985 and
1986.
I think in that unit price of A$66 million ,they can buy
F16C/D.
BTW,how much F16 then?
2.Vietnwm era products
The original
$667 million contract with Kaman, signed in 1997,
.called for the supply of 11
helicopters. The one-off project involved fitting a wholly new
avionics package designed for the Royal Australian Navy into a
1960s airframe
3.Other people scrap metal,My treasure bought at gold price
The US Navy phased out Seasprites, nicknamed "Seapigs" by their
American crews, in the early 1990s (Note:Aussie contract
sign in 1997!!)and the last of them stopped flying with a
US naval reserve unit in 2000.
Oh I just know Aussie, like SG,
loves to buy bargain scrap and refurbrish it.But SG is
considered
much smart in the market and known as Reference Customer in
defense
procurement!!
4.Worse,the good managemnet there make the
Seasprites, nicknamed "Seapigs"
to be chopped.Aussie tax
payer now kiss the A$1,000,000,000 or $1 billion away,even the
project is 6 years behind schedule.

seven of Australia's Seasprites were built between 1963 and 1965.
The remaining four
were constructed between 1985 and 1986.
unit price of A$66 million,bought in 1997!!
5.search ''Kaman+Seasprites'' in http://sg.yahoo.com/?rs=1
6.Pl tell me why Aussie buy old heli 10 years ago with so many
choice in the market.$$$ is a small issue compared with the reasons
to Buy old air frame !!
7.Aussie police force :
was riddled
with "deep-seated and continuing
corruption".
-- Don Stewart.Mr Stewart, one of Australia's most respected
judicial figures.
--http://www.ntnews.news.com.au/common/story_page/0,7034,21050190%255E421,00.html
I can say this apply to other ministries of Aussie,sad to say.
3.i feel a joke that the heli was decribed as ''state of the
art'' here.
http://www.defence.gov.au/cgi-bin/htsearch?words=Seasprites&submit=Search
4.here are more
info:http://www.defence.gov.au/minister/NelsonMinTranscripttpl.cfm?CurrentId=5644
The concern that I
have is that the project, due largely to problems with the prime
contractor, Carmen, and some other technical difficulties, this
project is now five years behind. The Director of Naval Aviation
has had no choice but to ground the helicopters until recent
further software problems have been resolved.
5.The helicopters were grounded in May 2006, after problems with
the flight control system and ITAS software. A review of the
programme was initiated in May 2006 and, in May 2007, the RAN
decided to continue with the project rather than pursue
alternatives. The helicopters are expected to achieve initial
operating capability in 2011. The RAN SH-2G(A) are armed with
Kongsberg Penguin mk2 mod 7 air-to-surface missiles, with a range
of over 30km, and mk46 torpedoes.
http://www.naval-technology.com/projects/anzac/