Its just the first day of operations for the Pasir Ris side.
Give them time. Every handover is different due to the different
route profiles, as such, they will need time to learn how to manage
the different routes.
Trust me, even if SMRT takes over SBS area, or SBS takes over
SMRT area, the two long time operators will still face teething
problems on the first few days.
Agreed..Furthermore whatever schedule you proposed still have to
go through LTA,Not suka2 go here and there.Pasir Ris/CV/CGA is 80%
former SBST BCs and management leh,Not some kucing kurap doing the
job.