Oh well that's unfortunate. Doesn't matter, they managed Loyang
well and they gave lowest price!
After all, if we can give OKP the contract for the flyover why
not do the same for BCM?
GAG so far so good. Can't say the same about Sun Gee. It was
their bus that blew up due to design flaws. But then again,
Transperth had 6 CNG buses burn down, albeit without fatalities.
One of these vehicles (TP1610) was allocated to TT.
WTS bid unsuccessfully for 3 contracts despite their long
history as a private operator and their cool fleet. One thing i
noticed is they always bid high.