If you want 161 to fly, you can go back in time during the early
2000s.
When 161 had a fleet of only 9, with a frequency of 20
minutes.
And when the scheduling was so tight that it took a VSO to be
stopped by traffic police on the highway before they did something
about speeding.
And where strange antics by 161 BCs desperate to further
increase the speed included the bizarre act of putting the bus in
neutral downhill. That allowed the bus to accelerate to speeds you
guys can scarcely believe.
To what end?

The 161 back then was unreliable, SD dominated fleet, and
speeding everywhere the bus went.
Is that what you guys want?

citaro neutral on downhill is shioooook ttm.