Train connecting Singapore and Johor? Impossible..... There
would be an argument on who is going to pay for rolling stock ,
track , station , etc. But if this is the future MRT line of
Singapore..... We no place to live liao la....... Lowest HDB block
would already be 40 floors.
Why?
1: There might be chances that, Singapore - part of JB special
economic zone no need passport de. So this may not be an issue (Of
Woodlands Train Checkpoint). Regarding rolling stock, track,
station, I think is not an issue as well.
My suggestion is for the station wise, Malaysian authority will
do Malaysia JB sector. Singapore LTA will plan the track sector for
Singapore side.
Rolling stock? Either they formed a joint LTA, or having 2
rolling stock with different porpotions, based on the track length,
proposed economical benefits etc.
2: All future MRT lines should be fully underground, I think it
might be possible for LRT stations in future to be underground as
well. So, for no place to live is not too valid, and I think the
future lowest should be around 15 to 25 floors and 30 ~ 40 floors
should be the median. Dont forget that our land cannot support >
240 ~ 280m in height for the buildings. So, dont expect to have
many 60 (Or above) floor flats becoz it will become
"Sinkapore".