Well, what if I tell you that the tracks of the NEL are no where
near the entrance of Tanjung Pagar Railway Station? And that NE2
will be near Kampong Bahru/Jln Bukit Merah? Or that it may never be
built at all?
Well, point 1 of not near the KTM station is true, but point 2
not quite of never built at all becoz they might as well follow the
Khatib - Yio Chu Kang style with a no reserve code there.
The skipped from NE2 must be for a reason.
BTW, by not being near to the KTM station does not mean it does
not near to the TRACKS along the stretch of the route. As the
station will have to be closed down since the relocation and the
station will be preserved for historical values (Which is way
better than demolishing everything and everything), it means that
the land no longer belonged to the Malaysian and it means if it the
tracks were NOT demolished, they can built a NE2.