Based on your prediction, let me analyze
If LTA chose Option A, Keppel, then this NE2 will not be
affected by the KTM relocation in the first place and they should
have probably built a Woodleigh style and probably will open in
2030. (I cant see the use of this plot of land apart of PSA
terminal, which somebody else had clamied that for CCL to connect
from Marina Bay to Harbourfront will not earlier than 2027, as 2027
is the year where the land lease had ended)
If LTA chose Option B, Kampong Bahru, yes they are
seriously affected by the KTM tracks. So, I think this is more
likely option, as it is also much nearer to residential areas as
well.
But the NEL tracks above is the Malayan Railway train. How could
the station being construct? Must ask a permission right?