brotherchen1982 SG Proposed Schedule Of Construction For MRT Stations (Jun 07) Pioneer Station Station Structural Works Roof Arch Beam Construction, External Drainage & Planter Box Construction Architectural Works @ 1st Storey Entrance 1 Pilecap Construction 1st Storey Slab & Beam Construction Entrance 2 Concourse Level Slab & Beam Construction Joo Koon Station Station Structural Works Pier Column Construction Crossbeam Construction Entrance 1 Concourse Level Slab & Beam Construction Entrance 2 1st Storey Slab & Beam Construction
VODKA KE0601 SG Launch bridge in operation. Sun sets over Jurong West Stadium, ref. to Tamago's photo. Right-Click)
VODKA KE0601 SG New section of the tracks had been laid. Two telephone-booths are installed. New section of the tracks had been laid. Two telephone-booths are installed. From an alternate angle, although not visible. Bukit Timah hill and the JTC Tower are clearly visible in the original image. You can clearly see the difference between the freshly-laid ballast and concrete, and the old ones.
VODKA KE0601 SG Pioneer Station, progress is looking good. Casting yard, lifting structure and the launch bridge are visible. Foreign talents hard at work.
brotherchen1982 SG Strengthen the bridge Transporting the concrete up to the bridge through Concrete Pump Note : Pictures are taken w/o flash.
CAIX SG Cool pictures! Thanks for sharing these. Nowadays can’t get to take pictures of construction of elevated tracks because most new lines are underground… CCL, BTL, DTL etc.
brotherchen1982 SG Yes, I go there exercise everyday & have gone for a few S-League matches... S-League : Gombak Utd FC Address : Jurong West Sports & Recreation Centre 20 Jurong West Street 93 Singapore 648960
tintinspartan SG Well, nice one but what happened to the back road of the last pic with the NTU Arch. I remembered back in P1 that there used to be a busy road passing through but why did they close it and where the road currently leads?
brotherchen1982 SG It's Upper Jurong Rd, with Service 192/193 used plying along this road. The road U see in the picture is JW St 93 & it leads to the new stretch of Upp Jurong Rd. Phase 1 Half stretch of the road(bef JW St 93 was extended) was closed for construction of underground pipes while the other stretch provide linkage to St 93 & Service 192/193 was amended to ply Jurong West Ave 4>Pionner Rd Nth to the new stretch of Upp Jurong Rd connected by the extended Boon Lay Way. Phase 2 The other half of the road was demolished aft JW St 93 was extended to the new stretch of Upp Jurong Rd & it was used as part of construction site for the Jurong West Sport Cplx.
i_luv_erky SG the extension near pioneer is like too high , i once went there and saw 4.5M logo and compared to Lakeside MRT also 4.5M . the height is not the same.
brotherchen1982 SG B'cos there's a gentle slope on a stretch of Jurong West St 63(between St 61/Pioneer Rd Nth). Also Pioneer Stn is built at a higher ground than Boon Lay Stn, the bridge has to be designed to evaluate so to maintain the 4.5M height restriction over Pioneer Rd Nth.
brotherchen1982 SG Tracks only up to the distance where the old overrun used to be(before Blk 659 MSCP). Other parts only have the bridge & railings...
<Precious> SG Hmmmm, why's Tammy so interested in Boon Lay Ext? Is he working for some spy/terrorist ring?