Then what's the bloody difference?! Might as well scrap the
whole BCM altogether.
LTA intro 3 packages before releasing the rest for bidding for a
very good reason. It wants to ensure foreign firms/new local
entrants get a try without raising the stakes too high.
In other words, forget about SBST or SMRT winning Seletar. They
are there for wayang only...
Hi mr SMB128B, then what is the bloody difference too? They
allow sbs transit and smrt to bid for seletar package and they will
not choose them no matter what? Like that, they may as well tell
them not to bid.
For my mail above, I am trying to tell that LTA may have been
dumbfounded by the flow of events leading up to the Go Ahead
Singapore issue which causes them to delay the closure of seletar
package tender. So stability may have overridden other criterias.
Do not forget that seletar package introduction was way before the
Go Ahead issue.
Your point of LTA introducing 3 packages to raise foreign stakes
in local transport scene will be very valid before the Go Ahead
debacle in the authorities mind. However, it has all changed after
the issue. Cheers. Thanks.